Skip to content

Matching Posts

A large hole has been dug at our site for a new build contemporary Arts and Crafts house near the South Downs.

With the foundations piled and the site dug down to the required levels, we will imminently begin constructing this new build house, starting with the basement pool. The site is being prepped for the pouring of the floor slab and forming the pool, walls will follow soon after.

See our previous post on this project here.

https://youtube.com/shorts/0vTRXXkqLTQ